2013–2016

Parliament Building of Baden-Württemberg Read more

The skylights for the plenary hall were integrated level in the double-skin roof surface. The diffused light from the translucent conical surfaces illuminates the daylight ceiling in the hall almost uniformly.

© Marcus Ebener

While renovating the landmarked Landtag (state parliament) in Baden-Württemberg — the first construction of a parliament building in Europe after the Second World War — the plenary hall is to be naturally lit and opened up to the adjacent foyer. The building captivates with its uncompromising modern design: behind a large format glazed facade there are open spaces that contrast the introverted plenary hall in the middle of the building.
The challenge was to reconcile the desire for improved working conditions with the spatial dramaturgy of the building. Therefore, the glazed openings in the hall walls were placed so that the contrast between the approximately square building with its office zones and the nine-sided hall is preserved. The daylight ceiling in the plenary hall results in an entirely new spatial impression. In consideration of the ceiling’s load-bearing behaviour, the plenary hall is made brighter through small openings in the roof plane. Interspersed conical openings enable a direct view to the sky. As a reminder of the old hall, the geometry and proportions of the original wood panelling were adopted in the design of the new surfaces. In order to achieve effective protection from the sun — while at the same time maintaining the exterior impression of the façade — the office zones received a second, interior glass facade, which can be shaded by blinds in the space between the two facades.

Projektdetails

Commendation – Beispielhaftes Bauen Stuttgart 2019
Special Prize »Tageslicht« – Deutscher Lichtdesign-Preis 2018
Hugo-Häring State Prize 2018 from BDA Baden-Württemberg
Commendation - German Architecture Prize 2017
Hugo Häring Award from BDA Stuttgart 2017

 

 

 

Negotiation procedure Top Rank, 2012
Client Federal State of Baden-Württemberg
Planning started 2013
Completion 2016
Total floor area 12,500 sqm

Negotiation procedure
Project Management: Thomas Schmidt
Team: Diana Sarić, Ulf Theenhausen, Charlotte Stein, Ivan Kaleov

Planning and Realization
Project Management: Thomas Schmidt
Deputy Project Management: Noah Grunwald
Team: Marco Ullrich, Dominik Weigel, Jens Achtermann, Ivan Kaleov, Lukas Oelmüller, Sandra Herzog, Bettina Schriewer, Johanna Bornkamm, Leila Reese, Hjördis Klein, Florian Nusser, Tanja Klein, Nicole Lochocki, Julia Berger, Sabine Zoske, Ruben Beilby
Construction Management Coordination: Dirk Richter

Local Construction Management: ERNST² Architekten, Stuttgart
Lighting design: Licht Kunst Licht, Bonn